Where we deliver
We fabricate at Bernalillo, New Mexico and deliver within a 520-mile radius — New Mexico, Arizona, Colorado, Utah, West Texas and southern Nevada. Beyond that, ask anyway: on a full load the freight often still works.
What 520 miles covers
Distances below are straight-line from the Bernalillo yard. Road miles run longer, so anything within about fifty miles of the edge is worth a call before you plan around it.
| State | Cities and distance |
|---|---|
| New Mexico | Albuquerque 17 · Santa Fe 43 · Gallup 124 · Farmington 135 · Roswell 176 · Las Cruces 207 |
| Colorado | Durango 154 · Pueblo 230 · Colorado Springs 261 · Grand Junction 281 · Denver 317 · Fort Collins 373 |
| Arizona | Flagstaff 288 · Mesa 328 · Tucson 332 · Phoenix 340 |
| West Texas | El Paso 246 · Amarillo 266 · Lubbock 293 · Odessa 340 · Midland 345 · Abilene 438 |
| Utah | Moab 279 · St. George 410 · Salt Lake City 475 |
| Nevada & Wyoming | Cheyenne 413 · Las Vegas 485 |
Oklahoma City sits at 509 miles — inside the radius as the crow flies, but a long haul by road. Dallas, Fort Worth and Wichita fall outside it.
How the load arrives
Panels and trusses are long, heavy and easy to damage. How they come off the truck matters as much as when they arrive, so we agree the offload before the load is scheduled.
- FlatbedStandard delivery. Your crew or equipment offloads. Lowest cost, and fine where there is a machine on site.
- Boom truckWe set the bundles where you want them, including onto a wall plate. Booked in advance, priced per load.
- StagedLarge packages split across multiple loads in placement sequence, so your crew is never sorting a stack.
- Site accessTell us about tight turns, soft ground, overhead lines or a narrow gate before delivery day. A truck that cannot get in is a lost day for both of us.
What to expect on timing
| Stage | Duration | What you do |
|---|---|---|
| Quote from complete plans | [LEAD TIME] | Send the plans and site criteria |
| Sealed drawings after order | [DAYS] | Review and approve, or mark up |
| Fabrication after approval | [DAYS] | Confirm the delivery date and offload |
| Delivery window | [DAYS] | Have the site and the crew ready |
Approval is the stage that slips most. Drawings sitting unapproved on a desk is the single most common reason a package misses its framing date.