Floor trusses

Open-web floor trusses

Longer clear spans than dimensional joists, and an open chase for mechanical runs. No drilling, no notching, no field engineering to get a duct across a room.

The case for them

Why open-web instead of joists

A solid joist has to be drilled or notched for every pipe, duct and cable that crosses it, and every hole is governed by rules the framer has to get right on site. An open-web floor truss leaves the space between the chords open by design.

  • Longer clear spans, so fewer bearing walls and beams below
  • Full-depth chase for HVAC trunk lines, waste pipe and wiring
  • Wider nailing surface at the top chord than a 2x joist
  • Flatter, squeak-resistant floors with less shrinkage movement
  • Ribbon or open ends to suit your bearing detail
Sizing

Depths and spans

The table below shows the depths we fabricate and the span range each one typically reaches at 19.2" and 24" on centre. Actual spans are set by the sealed truss design for your loads — treat these as planning figures, not permission to build.

Open-web floor truss depths — planning spans only
Nominal depth Typical span @ 19.2" o.c. Typical span @ 24" o.c. Common use
12"up to 16 ftup to 14 ftShort spans, shallow floor systems
14"up to 19 ftup to 17 ftResidential rooms, light mechanical
16"up to 22 ftup to 20 ftThe most common residential depth
18"up to 25 ftup to 23 ftOpen plans, ducted chases
20"up to 28 ftup to 26 ftLong clear spans, multi-family
24"up to 32 ftup to 30 ftCommercial floors, large trunk ducts

Spans assume 40 psf live load and 10 psf dead load with a L/480 live-load deflection limit. Heavier loads, tile finishes, or a stiffer deflection criterion shorten every figure above.

Details

End conditions and openings

Open end

Top and bottom chords run to the bearing with the web open. Bears on a wall plate or a ledger.

Ribbon end

A continuous ribbon board ties the truss ends together, squaring the floor system and simplifying layout.

Bearing block

Vertical block at the bearing where reactions are high or the truss sits on a beam rather than a wall.

Stair openings

Trimmed and headed at the shop with the doubling shown on the placement plan — not cut in on site.

Duct chases

Tell us the trunk size and route and we design a clear opening on the run rather than a chase you have to fight.

Cantilevers

Balcony and bay cantilevers designed into the truss with the back-span and hold-down requirements stated.

Next step

Send us the plans. We’ll send back a price.

Upload your floor plans or framing drawings and we will come back with a quantified package, a placement diagram and a delivery date.